Assura plc

Committed to only owning, occupying and developing net zero carbon assets by 2030, Assura plc recently moved their HQ from Warrington to 3 Barrington Road premises in Altrincham and have transformed it into a modern workspace environment; making improvements which not only boost the environmental performance of the building but also the well-being amenity for their staff.

Live planting schemes to both the interior and exterior formed part of these improvements and we were delighted to assist with both. Exterior plants in containers were selected to match company branding and a HYVERT living wall was installed next to the building's main entrance. This particular HYVERT will also specifically incorporate rainwater reutilisation capabilities to assist with the building's improved environmental performance. You can read more about our workspace interior project work for Assura plc here.

Technicals

Type >> HYVERT Living Wall

Size >> 17.5 sqm total (L-shape design)

No. of Plants >> 1643

Species >> Asplenium Scolio, Dryopteris Affinis, Euonymus Radicans, Hedera Helix, Leucothoe Zeblid, Pachysandra, Polypodium Vulgare, Sarcococca

Designer >> I Want Plants - HYVERT

Want to see more?

<< Last Project

No 1 St Paul’s Square

Next Project >>

Breakthrough Properties

Request A Callback

If you have an idea or would like to discuss a project, please enter your details and our team will be in touch.

  • What services are you interested in?
  • This field is for validation purposes and should be left unchanged.